1.What is the formula to calculate productivity of : 1- asphalt batch plant, 2- concrete batch plant, 3- truck mixer
2.Calculate the minimum set-back distance required for a national highway of 4 lane divided carriageway having circular curve of radius of 350 m & design speed 100 km/hr.