Determine if there is a relationship between machine hours and utility costs.
Month
|
Machine Hours
|
Utility Costs
|
1
|
2000
|
900
|
2
|
2800
|
1420
|
3
|
3200
|
1200
|
4
|
3000
|
1200
|
5
|
2200
|
1300
|
6
|
2400
|
1000
|
A. Using either the high-low method or regression analysis, determine the equation for a line. Need step by step please for high and low method and regression method. Need for study reference.
B. In month 7 the machine hour volume will be 3600 hours. Determine the expected utility cost.
C. Do you think machine hours is a good predictor of utility costs? Please explain