Manufacturing overhead-multiple application bases Eddie Lander Tie Co. manufactures neckties and scarves. Two overhead application bases are used; some overhead is applied on the basis of raw material cost at a rate of 120% of material cost, and the balance of the overhead is applied at the rate of $8.00 per direct labor hour.
Required:
Calculate the cost per unit of a production run of 1,800 neckties that required raw materials costing $6,620 and 200 direct labor hours at a total cost of $2,240.