Question - The allington screen plant of allington windows manufactures new and replacement screens the plant produces more than 500 different screen sizes and offers four different aluminum frame colors plant overhead is absorbed to each screen produced using the square inches of the screen as the allocation base the single plant wide overhead rate estimated before the year begins is based on a flexible budgeting dived by budgeting volume is measured in square inches of the screens produced the following table summarizes operations for the year
Budgeting variables overhead per sq in $0.01
Actual overhead incurred $4287482
Budgeted fixed overhead $3594240
Over absorbed overhead $797759
Actual volume sq in 141256700
Calculate the budgeted volume amount (in screen square inches) allington screen plant used in computing the plant wide overhead rate for the year?