Information Provided
Actual Direct Materials $5,000.00
Actual Direct Labor $9,000.00
Actual Variable Overhead Costs $20,000
Actual Fixed Overhead Costs $26,000
Variable Direct Labor Predetermined Measure 200%
Fixed Direct Labor Predetermined Measure 300%
Calculate actual costs of the job.
Calculate normal costs of the job using predetermined overhead rates.