Assignment:
Rockness Recycling refurbishes rundown business students. The process uses a moving belt, which carries each student through the five steps of the process in sequence. The five steps are as follows
STEP DESCRIPTION
Step
|
Description
|
Time Required Per Student
|
1
|
Unpack and place on belt
|
1.0 minutes
|
2
|
Strip off bad habits
|
1.2 minutes
|
3
|
Scrub and clean mind
|
1.0 minutes
|
4
|
Insert modern methods
|
1.5 minutes
|
5
|
Polish and pack
|
0.8 minutes
|
One faculty member is assigned to each of these steps. Faculty members work a 40-hour week and rotate jobs each week. Mr Rockness has been working on a contract from General Eclectic, which requires delivery of 2,000 refurbished students per week. A representative of the human resources department has just called complaining that the company hasn't been receiving the agreed- upon number of students. A check of finished goods inventory by Mr. Rockness reveals that there is no stock left.
a. Calculate the maximum output for each step.
b. Which step is the bottleneck?