1) What is the chain surveying? What operation involved in action surveying.
2) Define the following terminologies,
i. Land surveying
ii. Control point
iii. Base line
iv. Sections
v. Plan
vi. Map
3) a) Draw sketch of the theodolite and label all its parts
b) Briefly explain temporally and permanent adjustment of theodolite
4) Describe the criteria of choosing the most suitable equipment for specific survey