Bloom and Co. has no debt or preferred stock; it uses only equity capital, and has two equally-sized divisions. Division X's cost of capital is 10.0%, Division Y's cost is 14.0%, and the corporate (composite) WACC is 12.0%. All of Division X's projects are equally risky, as are all of Division Y's projects. However, the projects of Division X are less risky than those of Division Y. Which of the following projects should the firm accept?