In a Kaizen event focused on the catalytic converter process, the following improvements were made: • Production lead time was cut from 4 hours to 1.5 hours. • The batch size was reduced from 10 to 4. • Based on the improvement in process reliability, a safety factor of 4% may now be used How do these improvements affect the Kanban system? ( Subject: Engineering Design in production operations)