Average weekly demand for free-range dog biscuits is 80 bags per week, with a standard deviation of 16 bags. Ollah uses a continuous inventory review system to manage inven- tory of the biscuits. Ollah wants to set the reorder point high enough that there is only a 5% chance of running out before the next order comes in. Assuming that the lead time is a constant 2 weeks, what should the reorder point be?