1. Automated work order systems can _____________.
Assign work orders to individual workers
Track the status of work orders
Monitor worker productivity
All of the above
2. Predictive maintenance ___________________.
utilizes the predictions based on laboratory testing of equipment to define when preventive maintenance should be initiated
utilizes a variety of diagnostic tools to evaluate equipment condition in order to properly adjust the frequency of preventive maintenance ork
utilizes predictions based on the experience of other owners of similar equipment to decide when preventive maintenance should be erformed
is performed as per the recommendations of the equipment manufacturer on a set schedule
3. Thermographic scan, also known as thermal imaging, must be _______________________.
performed on electrical equipment when it is operating
performed on electrical equipment when it is secured
can identify loose electrical conditions
both A and C
4. ___________________ strives to eliminate or minimize any process, operation or material usage that does not contribute to an efficient maintenance operation.
Corrective Maintenance
Preventative Maintenance
Lean Maintenance
JIT