A 23 kVA, 50 Hz, 2300/230 V transformer has primary and secondary turns of 200/20. When rated voltage is applied, calculate the mutual core flux neglecting the winding voltage drops. At full load the leakage flux linking each winding is 1% of the mutual flux. Calculate the primary and secondary leakage reactances and the total reactance as referred to either side.