At a machine tool plant, five jobs must be completed
each day. The time it takes to do each job depends on the
machine used to do the job. If a machine is used at all, there
is a setup time required. The relevant times are given in
Table 20. The company’s goal is to minimize the sum of the
setup and machine operation times needed to complete all

Request for Solution File