Line 0 gives the cost of the process, Lines 1 through 5 give operating cash flows, and Line 5* contains the estimated salvage values. Porter"s cost of capital for an average-risk project is 10 percent.
a. Assume that the project has average risk. Find the project"s expected NPV. (Hint: Use expected values for the net cash flow in each year.)