Assume that overhead is charged on a flat rate basis each


Assume that overhead is charged on a flat rate basis. Each member of the project is assigned an overhead charge of $300/week. What would be the direct cost of labor for an employee, given that she is assigned to the project for 120 hours at $10.50?