Assignment developing requirements and sdr documents create


Discussion "Types of Design Reviews"

Look up articles on different types of design review processes for engineering projects on the EBSCO host and IEEE online Library resources from Grantham. Reserve one of the articles to discuss the significance of the selected design review process. Please make sure to provide a link to the article.

Should be 75 to 150 words, but may go longer depending on the topic. If you use any source outside of your own thoughts, you should reference that source. Include solid grammar, punctuation, sentence structure, and spelling.

Assignment "Developing Requirements and SDR Documents"

Developing Requirements and SDR Documents

1. Based on the lectures, the Engineering Design text (especially 2.2, 6.1, 6.3, 7, and 8), and your research, do the conceptual design (as explained in Chapter 2 and also above) for your project. Two or three alternative designs should be considered with functional block diagrams for all of them. You may submit your Conceptual Design Review or System Design Review document as a powerpoint presentation or as a written document. You may use templates as a guide by doing a search of "conceptual design review template" or "system design review template."

2. Create a Project Requirements Document for your chosen design. It should include a functional block diagram of the design along with the functional specifications. This should be a written document. It is worthwhile to look for templates to guide you by doing a search of "project requirements document" or "requirements specification template" or "specification document template."

3. Update your Lessons Learned Document.

Request for Solution File

Ask an Expert for Answer!!
Project Management: Assignment developing requirements and sdr documents create
Reference No:- TGS02210295

Expected delivery within 24 Hours