Problem: The following matrix contains the costs (in dollars) associated with assigning Jobs A, B, to Machines 1, 2, 3, 4, and 5. Assign jobs to machines to minimize costs.
Machines
Jobs 1 2 3 4 5
A 6 11 12 3 10
B 5 12 10 7 9
C 7 14 13 8 12
D 4 15 16 7 9
E 5 13 17 11 12.