As with any costing system, a firm should use activity-based costing (ABC) when the:
A) Currently used system doesn't seem to be working
B) Benefits of such a system exceed the cost of implementation
C) Firm wants more detailed information
D) Firm’s production growth exceeds 20 percent per year
E) Current system has been in use for a long time