As an Industrial Engineer you are asked to conduct a feasibility study to justify the consolidation of tools and gauge cribs and providing a dispatching system in a manufacturing plant so that tools and gauges can be delivered directly to the production operators and manufacturing inspectors:
a) Explain clearly the specific advantages of such a system.
b) How would you conduct the study with particular reference to the collection of the relevant data and information to justify the project?