As a continuation of our course project due in Unit VIII, A Permit By Rule (PBR) Application for an Interior Surface Coating Facility, complete the next section, "Operational Face and Filter Velocities," of your proposal by following the instructions carefully, and then submit your continued draft for grading.
Instructions
1. Closely read the Required Reading assignment from your textbook, the TCEQ (2011) document, and the UnitLesson in the Study Guide.
2. Open your proposal draft from Unit IV and make any improvements to your draft using your professor's feedbackfrom the Unit IV project assignment.
3. Open the Unit V Study Guide, read the Unit V Lesson, then review the calculations demonstrated and explainedregarding face velocity calculations and filter velocity calculations for our scenario.
4. Make your Unit V work your fourth level 1 heading titled "Operational Face and Filter Velocities." Describe anddemonstrate (illustrate) the calculations for the following for this section of your project: (a) calculate the facevelocity and (b) filter velocity of the spray booth in a minimum one-page, double-spaced document