Problem:
Prepare a paper that analyzes an IT work-related project or fictitious project using systems analysis for a selected business system at the department or division level. Include information-gathering techniques and design methods used in the project. Analyze and evaluate what made the project a success or a failure. Must be APA formatting and provide two references.