Assignment: Project Cost and Time Management
i. Analyze methods for planning, estimating, budgeting, and controlling costs
ii. Construct a project plan which includes cost, scheduling, and risk assessment
iii. Construct and apply Gantt Charts, CPM, and PERT techniques to project management
iv. Evaluate methods for activity defining, activity sequencing, activity duration estimating, schedule development, and schedule control
v. Evaluate the impact of globalization on project cost and time management
vi. Evaluate the impact of technology on business
vii. Predict situations that present potential ethical and legal issues, and develop solutions
Format your assignment according to the following formatting requirements:
i) The answer should be typed, using Times New Roman font (size 12), double spaced, with one-inch margins on all sides.
ii) The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.
iii) Also include a reference page. The Citations and references must follow APA format. The reference page is not included in the required page length.