Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you:
Identify the required pre-workshop activities.
Prepare a risk workshop agenda based on Day, Sample Agenda for a First Risk Assessment / Two - Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case.
DAY
Morning
1. Introductions
2. Confirm project objectives
3. Confirm scope of risk process for this workshop
4. Workshop ground rules
5. Risk management briefing (if required)
6. Expectations and Results
7. Identify risks
Brainstorm risks using the risk breakdown structure
Afternoon
Analyze assumptions and constraints to generate further risks Standard risk checklist to identify any further/final risks
8. Rationalize risks
9. Describe risks using risk metalanguage
10. Record identified risks (during workshop or after meeting)
Determine the top five (5) threats in a risk register, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each threat.
Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment.
Document the top three (3) opportunities in a risk register, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each opportunity.
Justify the assignment of probability and impacts for each opportunity identified in criterion number 5 of this assignment.
Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date.
The cover page and the reference page are not included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Assess and prioritize risks to the project through an analysis of the active threats and opportunities presented.
Apply the Active Threats and Opportunities Management (ATOM) process to ensure a consistent, measurable result of this analysis.
Use technology and information resources to research issues in project risk management
Write clearly and concisely about project risk management using proper writing mechanics.
Attachment:- case_study_pack.rar