An analysis of the accounts of Chamberlin Manufacturing reveals the following manufacturing cost data for the month ended June 30, 2010.
![520_Prepare the cost of goods manufactured schedule.PNG](https://secure.tutorsglobe.com/CMSImages/520_Prepare%20the%20cost%20of%20goods%20manufactured%20schedule.PNG)
Costs incurred: Raw materials purchases $54,000, direct labor $57,000, manufacturing overhead $19,900. The specific overhead costs were: indirect labor $5,500, factory insurance $4,000, machinery depreciation $4,000, machinery repairs $1,800, factory utilities $3,100, miscellaneous factory costs $1,500. Assume that all raw materials used were direct materials.
Instructions
(a) Prepare the cost of goods manufactured schedule for the month ended June 30, 2010