An asphalt plant can produce 300 tph. A project requires paving individual lO-ft lanes with a 1-in. lift averaging 115 lb/sy-in.
What average paver speed will match the plant production?
How many 14-ton dump trucks will be required if the total hauling cycle time is 40 min? (52.5 ftlmin.; 15 trucks)