Algebraic transportation problems


Assignment:

Q1. Green Valley Mills produces carpet at plants in St. Louis and Richmond. The carpet is then shipped to two outlets, located in Chicago and Atlanta. The cost per ton of shipping carpet from each of the two plants to the two warehouses is as follows:

                                                                                    To (cost)

                                    From                            Chicago                       Atlanta

                                    St. Louis                         $40                             $65

                                    Richmond                        70                                30

The plant at St. Louis can supply 250 tons of carpet per week; the plant at Richmond can supply 400 tons per week. The Chicago outlet has a demand of 300 tons per week, and the outlet at Atlanta demands 350 tons per week. The company wants to know the number of tons of carpet to ship from each plant to each outlet to minimize the total shipping cost. Solve this transportation problem.

Q2. Given a transportation problem with the following costs, supply, and demand, find the optimal solution by using the computer:

                                                                    To (cost)

                From                  1                      2                      3          Supply

                   A                   $6                    $7                    $4               100 

                   B                    5                        3                     6               180

                   C                     8                       5                      7              200

                   Demand        135                    175                  170

Q3. Coal is mined and processed at the following four mines in Kentucky, West Virginia, and Virginia:
           Location                     Capacity (tons)
A.    Cabin Creek                                   90
B.    Surry                                              50
C.    Old Fort                                          80
D.    McCoy                                            60
                                                             ___
                                                            280
These mines supply the following amount of coal to utility power plants in three cities:
 
Plant                                       Demand (tons)
1.    Richmond                              120
2.    Winston-Salem                      100
3.    Durham                                  110

The railroads shipping costs (in thousands of dollars) per ton of coal are shown in the following table. Because of railroads construction, shipments are pro from cabin creek to Richmond:
                                                                  To(coats, in $1000s)
From                                                   1                              2                           3 
A                                                        $7                            10                          5
B                                                        12                             9                           4
C                                                         7                              3                          11
D                                                         9                               5                          7

Provide complete and step by step solution for the question and show calculations and use formulas.