air conditioning1- cooling and heating load


Air Conditioning
1- Cooling and Heating Load Estimate using CAMEL program library and the data from DA-9 Perform a cooling load and heating load estimate for

  • The Board room on the 10th floor and
  • The single office on the ground floor as shown on the supplied drawing.

2. Supply Program printouts of the following.

  • Input Data Sheets
  • Output summary table of annual max load for each zone.

3. A brief one page summary of your results commenting on the time of maximum load, supply air quantities, the major factors contributing to the overall heat load.

Request for Solution File

Ask an Expert for Answer!!
Mechanical Engineering: air conditioning1- cooling and heating load
Reference No:- TGS0443476

Expected delivery within 24 Hours