After you reevaluated the project based on the lower sales volume, the president asked you to reevaluate the project again, this time considering a lower and higher sales price, a higher and lower variable cost, a higher and lower fixed cost, and a lower and higher salvage value, showing the difference in NPV for the change in each variable. This exercise is an example of.