Assignment:
Q1. Discuss why a good measuring system should guide the progress of the project team rather than management alone.
Q2. What are the advantages of having the project team design its own metrics and measuring system?
Your answer must be in 250 words, typed, double-spaced, Times New Roman font (size 12), one-inch margins on all sides, APA format and also include references.