According to the lab layout reference diagram determine and


Perform the following steps:

According to the Lab Layout Reference Diagram, determine and apply the initial switch configuration on the NYACCESS1 and NYCORE1 switches.

According to the Lab Layout Reference Diagram, determine and apply the initial router configuration on the NYEDGE1 and NYEDGE2 routers.

According to the Lab Layout Reference Diagram, determine and apply the VLANs and Trunk configurations to meet the following requirements:

On NYACCESS:

Create VLAN16 - Named Engineering

Create VLAN17- Named Marketing

Create VLAN18 - Named Sales

Configure Fa0/1 as a member of VLAN16

Create SVI VLAN17withIP Address 192.168.17.10/24

On NYCORE1:

Create VLAN16 - Named Engineering

Create VLAN17- Named Marketing

Create VLAN18 - Named Sales

Create trunk links between NYACCESS1 and NYCORE1 for VLANs 16 - 18

Create a trunk link between NYCORE1 and NYEDGE1 for VLANs 16 - 18

According to the Lab Layout Reference Diagram, determine and apply the configuration necessary to implement inter-VLAN routing with router on a stick on NYEDGE1 for VLANs 16 - 18.

Configure a default route on NYEDGE1 to 192.168.254.2.

Configure a static route on NYEDGE2 for 192.168.16.0/24 to NYEDGE1

Verify all configurations.

From within Practice Labs, copy and paste the final config from each device into a Microsoft® Word document. Please ensure that you have a full "show running config" output visible from any devices modified as part of the lab. Save the file as "Final_Configuration".

Solution Preview :

Prepared by a verified Expert
Computer Networking: According to the lab layout reference diagram determine and
Reference No:- TGS02761494

Now Priced at $20 (50% Discount)

Recommended (92%)

Rated (4.4/5)