Products S5 and CP8 each are assigned $50.00 in indirect costs by a traditional costing system. An activity analysis revealed that although production requirements are identical, S5 requires 45 minutes less setup time than CP8.

According to an ABC system, CP8 is ________ under the traditional system.

a) undercosted

b) accurately costed

c) fairly costed

d) overcosted