Products S5 and CP8 each are assigned $50.00 in indirect costs by a traditional costing system. An activity analysis revealed that although production requirements are identical, S5 requires 45 minutes less setup time than CP8.
According to an ABC system, CP8 is ________ under the traditional system.
a) undercosted
b) accurately costed
c) fairly costed
d) overcosted