ABC Motorcycles is building a new manufacturing facility and your operations management and engineering team is charged with developing the facility layout, process flow, value stream map, technology recommendations and work space design recommendations for the new motorcycle facility. You are to prepare a recommendation report for this project.
Facility requirements: Build 500 motorcycles per day (250 days a year), manufacturing process include: frame welding, frame painting, gas tank painting, engine assembly, final assembly and testing.
Your report should include the following information for sections 1-5.
1. The type of manufacturing process best suited for building a motorcycle
2. Value stream map of the processes – Costs can be left off of your VSM.
3. Types of technologies you will use (from automation to manual assembly) for each of the process major steps
4. Work space design for the final motorcycle assembly stations.
5. Facility floor layout showing how the processes fit in sequence.