A wastewater treatment plant has two rectangular primary


A wastewater treatment plant has two rectangular primary settling tanks, each 40 ft long, 12 ft wide, and 7 ft deep. The effulent weir length in each tank is 45 ft. The average daily wastewater flow is 387,000 gal. Calculate the overflow rate and effulent weir loading. What is the estimated BOD removal?

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: A wastewater treatment plant has two rectangular primary
Reference No:- TGS0657045