A supplier contract with a manufacturer requires that component returns be transacted in the ERP system within 23 hours. A sample 75 transactions was collected and resulted in a mean of 25.5 hours. The standard deviation is 4. Determine the value of the test statistic. Include 2 decimal places in your answer.