A Six Sigma process step is expected to be successful 99.99966% of the time. Hypothetically, if a process had 150,000 steps and each and every step was at exactly a Six Sigma level, what would be the yield for the whole process?
A. 60.00%
B. 87.88%
C. 95.45%
D. 94.384%