A deposit of soil is 16 m deep and overlies an impermeable stratum: the coefficient of permeability is 1 micro m/s. A sheet pile wall is driven to a depth of 12.00 m in the deposit. The difference in water level between the two sides of the piling is 4.00 m. Draw the flow net and determine the quantity of seepage under the piling.