A rubber-tired scraper with an efficiency of 50 minhr has a


A rubber-tired scraper with an efficiency of 50 min/hr has a heaped capacity of 20 cu yd. If it is to move material with a swell factor of 25%, what amount of in-bank material can it move in 1 hr, assuming it has a total cycle time of 5 min?