A reservoir at elevation 700 ft will supply a second reservoir at elevation 460 ft. The reservoirs are connected by 1300 ft of 24-in cast-iron pipe and 2000 ft of 20-in cast iron pipe in series. What will be the discharge delivered from the upper reservoir to the lower one?