Question: A proposed nuclear power plant will cost $2 billion to build and then will produce cash flows of $280 million a year for 15 years. After that period (in year 15), it must be decommissioned at a cost of $880 million. What is project NPV if the discount rates are 5% and 18%? The response must be typed, single spaced, must be in times new roman font (size 12) and must follow the APA format.