A project under consideration has an internal rate of return of 17% and a beta of 0.4. The risk-free rate is 7%, and the expected rate of return on the market portfolio is 17%.
a-1. Calculate the required return.
a-2. Should the project be accepted?
b-1. Calculate the required return if its beta is 1.4.
b-2. Should the project be accepted?