A project under consideration has an internal rate of return of 16% and a beta of 0.8. The risk-free rate is 6%, and the expected rate of return on the market portfolio is 16%.
Calculate the required return = ____ %
Should the project be accepted, yes or no?
Calculate the required return if its beta is 1.8
Required return = _______ %
Should this project be accepted, yes or no?