A product has the following requirement. The setup cost each time is $150, the inventory holding cost is $2.50 unit per week. There is no Begging Inventory, and there is no scheduled receipts. Assume the lead time is 0.
1. Determine the MRP using the EOQ lot-sizing rule.
Find the EOQ from the information giving in Excel
Attachment:- Blackberry Final Report.docx