a pre-engineering base line was run down a very


A pre-engineering base line was run down a very steep hill.rather than measure horizontaily down hill with steel tape: surveyor measured the vertical angle with the theodolite and slope distance with 16m steel tape. The vertical angle was 21 degree and 26 minutes turned to a point on a plumbed range pole 1.5m above ground.The slope distance from the theodolite to the point on the range pole was 45.3m. The theodolites optical center was 1.4 m above the upper base line station at 110+71.25

a) If the elevation of the upper station was 253m, what is the elevation of lower point

b) What is chainage of the lower station

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: a pre-engineering base line was run down a very
Reference No:- TGS0487252

Expected delivery within 24 Hours