A person hires a firm to build a CB radio tower. The firm charges $100 for labor for the 10 feet. After that, the cost of the labor for each succeeding 10 feet is $25 more than the preceding 10 feet. That is, the next 10 feet will cost $125, , the next 10 feet will cost $150, etc. How much will cost to build a 90-foot tower?