A painter is considering using a new high-tech paint roller. Using the old method, the painter could complete three walls in forty minutes. Using the new paint roller, two walls can be completed in twenty-four minutes. Which methodology is more productive?
old method: 5 walls/hour
none
roller method: .08333 walls/ minutes
roller method: 4.5 walls / hour
old method: .075 walls/ minute