A manufacturing shop is designed to operate most efficiently at an output of 950 units per day. In the past month the plant produced 750 units.
What was their capacity utilization rate last month? (Round your answer to 1 decimal place.)
The response must be typed, single spaced, must be in times new roman font (size 12) and must follow the APA format.