A manufacturing process consists of three sequential operations. At maximum capacity, operation A can output 120 units per hour, Operation B can output 135 units per hour, and Operation C can output 130 units per hour. There is one worker assigned to each of the three operations. Working at the maximum capacity level, what would be the output of this process in a 10-hour workday? A.)1200 units
B.)1300 units
C.) 1350 units
D.) None of the above