Question: A local manufacturer uses a part in production that has a normally distributed demand during the reorder period. The mean (average) demand during the reorder period is 120 with a standard deviation of 10. The plant manager wants the probability of a stockout during the reorder period to be 2% of the time.
a) What reorder point should be used?
b) How much safety stock should be maintained?