A job applicant is being tested for an assembly line position. Regular assembly-line workers are expected to perform the task within four minutes when they reached 1,000 performances.
(a) If the job applicant performed the first test operation in 10 minutes and the second one in 9 minutes, should this applicant be hired?
(b) What is the expected time that the job applicant would take to finish the 10th unit?