We want to decide whether to employ a human operator or buy a machine to paint steel beams with a rust inhibitor. Steel beams are produced at a constant rate of one every 14 minutes. A skilled human operator takes an average time of 700 seconds to paint a steel beam, with a standard deviation of 300 seconds. An automatic painter takes on average 40 seconds more than the human painter to paint a beam, but with a standard deviation of only 150 seconds. Estimate the expected waiting time in queue of a steel beam for each of the operators, as well as the expected number of steel beams waiting in queue in each of the two cases. Comment on the e?ect of variability in service time.